Refine your search
- Tool Kit
- NI Only
- General publications
- Case studies
- Resources for teachers
- E–bulletins
- Presentations/Talks
- Consultations
- Media
![]() |
page 1 of 1 |
![]() |
Case Study 2/12 – IKEA Belfast, Climate NI – 2014
This case details the efforts that IKEA Belfast has made in adapting its premises and operations…
Case Study 3/12 – DARD Rivers Agency: Flood Maps (NI), Climate NI – 2014
This case study details the drivers, implementation & outcomes of the update to Strategic Flood…
Case Study 7/12 – DHSSPS: Omagh Enhanced Local Hospital, Climate NI – 2014
This case study details the considerations and actions taken during the construction of…
Case Study 8/12 – Red Cross: Flooding and Mental Health, Climate NI – 2014
This case study details the creation of two reports by the British Red Cross on flooding…
Case Study 9/12 – NI Water: Carrowreagh Storm Sewer Sustainable Drainage (SuDS) Project, Climate NI – 2014
This case study details the planning and construction of…
Case Study 10/12 – Titanic Belfast, Climate NI – 2014
This case study details the adaptation features of Titanic Belfast, a recently constructed…
NI Water – Freeze Thaw Event 2010
How NI Water dealt with the coldest winter for 100 years and their plans to adapt in the future
NI Water – reducing the risk of flooding at Killyhelvin Water Treatment Works
After a 2009 period of 1 in 100 year flooding, NI Water decided to address weaknesses in the WTW
![]() |
page 1 of 1 |
![]() |